Certification body - Conformity certificate number
Long axis break
Kn
Minor axis break
Kn
Coque
Resistance
Usage load resistance (CMU)
Kn
Resistance to breaking load (CMR) or sliding
Kn
Sliding
Kn
Number of users
Breaking resistance
lb
Masse
lb
Pose
Allows New Pro or New Alp to be attached with a 90-degree rotation. Fixing on concrete or in crap. Tubular or square version integrating a fixing ring with a standard anchor point. Can be used in saline or chemical environments. Threaded head ready to receive three M12s for fixing the New Pro and New ALP
Height
mm
Fixation
Concrete with 4 M12X4 studs for fixing (mechanical or chemical) Minimum 125 mm. Or on the other hand plate. Fastening the new pro and new alp packs by M12. 3 bolts 1 in the center and two towards the fold. Clamping on the other hand plate with M12 bolts. For heights greater than 300mm a guy stay must be positioned.
By clicking on Register, you agree that Hookt processes your personal data in accordance with the legal notice and privacy policies
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
By clicking on “Accept all cookies”, you agree to the storage of cookies on your device to improve site navigation, analyze site usage, and help us with our marketing efforts. Check out our privacy policy for more information.