PACK RAUMER 160

Project Image
Project Image

<heading-style-h2>RAUMER 160 PACK <heading-style-h2>

<heading-style-h6>Multi-function anchor <heading-style-h6>

Raumer 160 pigtail bar assembled with iPack 4 80°. All-in-one anchoring for the creation of a continuous life line in Via Ferrata.

<heading-style-h3>Assembly procedure <heading-style-h3>

  1. Installation on non-friable rock. Drill to diameter 18 perpendicular to the wall while respecting a minimum depth of 160mm.
  2. Clean the hole with a metal swab. Remove dust by blowing with a pear. Fill 2/3 full with a chemical seal. Position the bar with a slight rotation.

<heading-style-h3>Installation advice <heading-style-h3>

Wait 24 hours before use.
The lifespan of the material depends on the quality of the support and the environment.
A minimum check every 12 months is required.

USE

OUTDOOR

Platinum
Inox I 4 80
Matrix
MAC I
Material
316L stainless steel, aluminium matrix
Bec
System
Bolts
4 GAC bolts 10x30 - 2 stainless steel bolts 10x100 + Nylstop nuts
Tightening torque
50 Nm
Upper stop
Lower stop
3-piece games
Diameter
mm
Vis
Angle
80
°
specifications
security
Norm
EU certificate type no.
Certification body - Conformity certificate number
Long axis break
Kn
Minor axis break
Kn
Coque
Resistance
Usage load resistance (CMU)
20
Kn
Resistance to breaking load (CMR) or sliding
40
Kn
Sliding
Kn
Number of users
Breaking resistance
lb
Masse
1.6
lb
Pose
Height
mm
Fixation
Montage
Section
ask for a quote
Free movements without danger
Free movements without danger

Follow our news

logo hookt
By clicking on Register, you agree that Hookt processes your personal data in accordance with the legal notice and privacy policies
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.