<heading-style-h2>Ipack 80 <heading-style-h2>
<heading-style-h6>Allows the creation of intermediate points. <heading-style-h6>
<heading-style-h3>Assembly procedure <heading-style-h3>
1. Check the condition of the anchor support and the cable.
2. Place a 12 or 14 mm Spit on a healthy area.
The use of chemical sealing may be necessary if the nature of the rock is not satisfactory.
Spit from 125 to 180 mm in stainless steel.
Position the 12 mm cable inside the aluminum matrix using the 4 M10 bolts. Tighten to a tightening torque of 50 Nm.
<heading-style-h3>Installation advice <heading-style-h3>
Check that the hook fits freely between the wall and the iPack.
Cable loops can be created identically to avoid a direct clash between the connectors and the iPack.
Attention: the hook must be able to pass freely.
The lifespan of the material depends on the quality of the support and the environment.
Deterioration may be increased in certain environments (snow, ice, falling rocks, etc.) .A minimum check every 12 months is necessary.
OUTDOOR