IPACK 80

Project Image
Project Image

<heading-style-h2>Ipack 80 <heading-style-h2>

<heading-style-h6>Allows the creation of intermediate points. <heading-style-h6>

<heading-style-h3>Assembly procedure <heading-style-h3>

1. Check the condition of the anchor support and the cable.
2. Place a 12 or 14 mm Spit on a healthy area.
The use of chemical sealing may be necessary if the nature of the rock is not satisfactory.
Spit from 125 to 180 mm in stainless steel.
Position the 12 mm cable inside the aluminum matrix using the 4 M10 bolts. Tighten to a tightening torque of 50 Nm.

<heading-style-h3>Installation advice <heading-style-h3>

Check that the hook fits freely between the wall and the iPack.
Cable loops can be created identically to avoid a direct clash between the connectors and the iPack.
Attention: the hook must be able to pass freely.
The lifespan of the material depends on the quality of the support and the environment.
Deterioration may be increased in certain environments (snow, ice, falling rocks, etc.) .A minimum check every 12 months is necessary.

USE

OUTDOOR

Platinum
INOX I 80
Matrix
MAC I
Material
Alu
Bec
System
Bolts
4 bolts GAC 10x30
Tightening torque
50 Nm
Upper stop
Lower stop
3-piece games
Diameter
mm
Vis
Angle
°
specifications
security
Norm
EU certificate type no.
Certification body - Conformity certificate number
Long axis break
Kn
Minor axis break
Kn
Coque
Resistance
Usage load resistance (CMU)
20
Kn
Resistance to breaking load (CMR) or sliding
40
Kn
Sliding
Kn
Number of users
Breaking resistance
lb
Masse
0.51
lb
Pose
Height
mm
Fixation
Montage
Section
ask for a quote
Free movements without danger
Free movements without danger

Follow our news

logo hookt
By clicking on Register, you agree that Hookt processes your personal data in accordance with the legal notice and privacy policies
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.