<heading-style-h2>PACK T <heading-style-h2>
<heading-style-h6>T-packs serve as entry/exit points. They are to be positioned at the start and at the end of the course. They can also be used as intermediate points. <heading-style-h6>
<heading-style-h3>Assembly procedure <heading-style-h3>
1. Check the condition of the anchor support and the cable.
2. Position the 12 mm lifeline cable inside the aluminum matrix using the 6 bolts.
Tighten to a tightening torque of 50 Nm.
<heading-style-h3>Installation advice <heading-style-h3>
Tighten the bolts evenly.
The final tightening torque is to be applied at the end of the assembly. Attention: the hook must be able to pass freely.
The lifespan of the material depends on the quality of the support and the environment.
Deterioration may be increased in certain environments (snow, ice, falling rocks, etc.).
A minimum check every 12 months is required.
OUTDOOR