PACK T

Project Image
Project Image

<heading-style-h2>PACK T <heading-style-h2>

<heading-style-h6>T-packs serve as entry/exit points. They are to be positioned at the start and at the end of the course. They can also be used as intermediate points. <heading-style-h6>

<heading-style-h3>Assembly procedure <heading-style-h3>

1. Check the condition of the anchor support and the cable.
2. Position the 12 mm lifeline cable inside the aluminum matrix using the 6 bolts.
Tighten to a tightening torque of 50 Nm.

<heading-style-h3>Installation advice <heading-style-h3>

Tighten the bolts evenly.
The final tightening torque is to be applied at the end of the assembly. Attention: the hook must be able to pass freely.
The lifespan of the material depends on the quality of the support and the environment.
Deterioration may be increased in certain environments (snow, ice, falling rocks, etc.).
A minimum check every 12 months is required.

USE

OUTDOOR

Platinum
INOX T
Matrix
MAC T
Material
316L stainless steel, aluminium matrix
Bec
System
Bolts
6 bolts GAC 10*30
Tightening torque
50 Nm
Upper stop
Lower stop
3-piece games
Diameter
mm
Vis
Angle
°
specifications
security
Norm
EU certificate type no.
Certification body - Conformity certificate number
Long axis break
Kn
Minor axis break
Kn
Coque
Resistance
Usage load resistance (CMU)
15
Kn
Resistance to breaking load (CMR) or sliding
33
Kn
Sliding
Kn
Number of users
Breaking resistance
lb
Masse
0.945
lb
Pose
Height
mm
Fixation
Montage
Section
ask for a quote
Free movements without danger
Free movements without danger

Follow our news

logo hookt
By clicking on Register, you agree that Hookt processes your personal data in accordance with the legal notice and privacy policies
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.